Sunday: Temporary Lane Closure On Causeway
The Ministry of Public Works said they would like to advisethe public that a temporary lane closure will take place on the two Mabey Bridges situated at the eastern end of the Causeway on Sunday [Apr 21] from 7am until 10am.
A spokesperson said, “The purpose of the lane closure is to enable Ministry personnel to tighten the bolts of the deck panels on both Mabey Bridges. During the temporary lane closure all traffic will be diverted onto one of the Mabey Bridges in single file under manual traffic control.
“The Ministry of Public Works wishes to encourage the full cooperation of the motoring public and apologizes for any inconvenience that may result.”
Read More About
Category: All
Would this be the two temporary (yes temporary) bridges that were erected seven years ago? Much discussion was given to building a new bridge but a certain commercial boat operator (who is now retired) complained that a bridge that didn’t open was unacceptable. So we got two lego bridges on a temporarly basis which had a life of five (yes five) years.
Why don’t we just drive over the bridge that no longer opens I ask?
I swear I see these bridges move when a heavy truck goes over – and even when I drive over in my little car it is scary. One day when one of these temporary bridges collapses and kills someone there will be a lot of angry people. Many will blame PLP since they were in power when the bridges were put up. Betty Trump and a couple of others will blame OBA since they are apparently to blame for everything including the weather. Some will blame UBP and the white slave masters.
Still these ugly unsafe lego bridge will be temporarily in place. Pathetic.