BELCO Grid Code Consultation To Begin
Today [Sept 5], BELCO begins its consultation process relating to its proposed Grid Code.
“Under BELCO’s transmission, distribution and retail licence, BELCO is required to develop a Grid Code for approval by the Regulatory Authority in consultation with sectoral participants and sectoral providers who are liable to be materially affected by the Grid Code,” the company said.
“BELCO will use the responses received through the consultation process to finalise the draft Grid Code prior to its submission to the Authority for approval.
“The Grid Code is a technical document intended to cover all material technical aspects associated with connections to and operation and use of its transmission and distribution systems [together, the “Grid System”] or, as applicable, the operation of electric lines and electrical plant connected to the Grid System.
“The Grid Code will also set the rules and procedures governing generation dispatch and maintenance scheduling along with rules and procedures that provide for the safe and reliable operation of the Grid System. All bulk generation licensees and distributed generators who wish to interconnect with BELCO will be required to adhere to the Grid Code.
“The draft Grid Code and accompanying response proforma may be downloaded from the home page of BELCO’s website, www.belco.bm or collected in hard copy format from BELCO’s head office on Serpentine Road. Detailed consultation guidelines are provided within the relevant consultation materials.
“BELCO invites interested industry stakeholders and members of the public to review and consider the draft Grid Code and submit any feedback by no later than Monday, 24 September 2018.
“Responses should be submitted to BELCO using the provided response proforma either by email to gridcode@belco.bm with the subject line “Grid Code Consultation” or in hard copy format to the main reception desk at BELCO’s head office on Serpentine Road. Responses received after the stated deadline or provided in a format not within the guidelines may not receive consideration.
“BELCO’s intends to post all relevant submissions received by the submission deadline to its website after the close of the consultation period. Responders may request anonymity and/or provide an original response along with a version redacting any sensitive information.”
Read More About
Category: All, Business, technology