Planning Guidelines For Hurricane Repairs

October 6, 2025 | 0 Comments

The Department of Planning has issued guidelines to assist property owners with repairs following Hurricane Imelda.

A Government spokesperson said, “The Department of Planning recognises the urgency of repairing storm damage following Hurricane Imelda and is committed to assisting property owners through the process. Technical officers are available to provide guidance and support.

Repairs to Buildings

  • Repairs using the same materials and design [e.g., windows, doors, or roof slate] do not require planning permission or a building permit if the damage is limited to non-structural issues. Owners may proceed immediately with these repairs.
  • Where structural damage has occurred, a building permit is required before work can begin. These applications will be prioritised and processed as quickly as possible. In cases of dangerous structural damage, emergency work may proceed without a permit provided the Department is notified, and a permit application is submitted promptly thereafter.
  • Under Class IV of the Development and Planning [General Development] Order 1999, a Permitted Development Permit may be used for storm or fire damage if no more than 60% of a building/structure has been destroyed and the replacement is no larger than the original building/structure.

Repairs to Listed Buildings and Historic Protection Areas

  • For non-structural repairs using identical materials and designs [e.g., doors, windows, or roof slate], no permit is required.
  • All structural repairs require a building permit, but these applications will be expedited.
  • The materials must replicate the style and detailing of the original structure.

Repairs to Seawalls and Docks

  • Replacements ordinarily require only a building permit to ensure compliance with the Bermuda Building Code 1998.
  • As seawalls and docks can affect the natural foreshore, planning permission may also be required in some cases. Property owners are encouraged to consult the Department before beginning repairs.

Need Help or More Information?

  • Building permit information: Miglena Yaneva at 246-7913 or myaneva@gov.bm
  • Development applications: Paul McDonald at 444-0917 or pamcdonald@gov.bm
  • General assistance: Call 297-7756 or visit the Department of Planning’s website.

Building Control Contact List

Miglena Yaneva Building Control Officer myaneva@gov.bm 246-7913
Aidan Stones Asst. Building Control Officer atstones@gov.bm 444-0922
Melvin Holdipp Building Inspector maholdipp@gov.bm 734-4537
Damon Walker Building Inspector djwalker@gov.bm 337-5524
Vernon Trott Electrical Inspector vetrott@gov.bm 734-4539
Victor Cann Electrical Inspector vccann@gov.bm 734-4538

“The Department of Planning thanks the public for their cooperation and assures property owners that all storm-related applications will be given priority treatment.”

The Planning Guidelines for Hurricane Repairs document follows below [PDF here]:

Read More About

Category: All, News

Leave a Reply